Home >>  Electronics  >>  railway control ststem using microprocessor

Railway control ststem using microprocessor
| Views: 17243


 

The aim of this project is to demonstrate the incorporation of computer method in railway traffic control to improve, safety, speed of handling the traffic and reliability. Here we employ the microprocessor (Intel 8085) to handle the signaling, track changing and gate operation and to monitoring the traffic. The system starts with the tracking if the train is sensed at the station side or starts with the gate operation (i.e. gate closing and opening) along with the track changing if the train is sensed at the gate side. Once the train arrival is sensed at a distance of about 3 kms the microprocessor performs the gate operation along with the track changing, the identification of the train is done at a distance of 3 kms accordingly the particular operation is performed by the processor.Depending upon the priority of the incoming train, the unengaged track is given for train halting.
Vote: Tell A Friend
Reply With Quote  

 

  

PLEASE PLEASE PLEASE

I NEED DETAIL IDEA OF YOUR PROJECT BECAUSE I HAVE BEEN SEARCHING A PROJECT FOR MY FINAL YEAR PROJECT

SEND IT ON pnd.srikant@gmail.com

PLEASE DO REPLY SOON
Reply With Quote   Reply With Quote

 

  

plz send me all the detail abt this pjct on naikisha1988@yahoo.co.in

plz snnd it asap..

Reply With Quote   Reply With Quote

 

  
i will b highly obliged if you could plz send me the details at phenom_nacromancer@yahoo.co.in
Reply With Quote   Reply With Quote

 

  

if any body got the details plz send it to my e-mail id phenom_nacromancer@yahoo.co.in

 

plzzzzzz guys help out 

Reply With Quote   Reply With Quote

 

  

I AM A 4TH YEAR STUDENT DOING ENGINEERING IN ELECTRONICS.

I WANT TO DO A PROJECT RELATED 2 MICRPROCCESOR.THIS ONE SOUNDS INTRESTING.CAN I GET FULL OF THIS ONE.PLZ CAN U MAIL ME THIS AS SOON AS POSSIBLE.MY MAIL ID ISMORADIYA_1989@YAHOO.IN
Reply With Quote   Reply With Quote
Page 5 of 8