Home >>  Electronics  >>  railway control ststem using microprocessor

Railway control ststem using microprocessor
| Views: 17241


 

The aim of this project is to demonstrate the incorporation of computer method in railway traffic control to improve, safety, speed of handling the traffic and reliability. Here we employ the microprocessor (Intel 8085) to handle the signaling, track changing and gate operation and to monitoring the traffic. The system starts with the tracking if the train is sensed at the station side or starts with the gate operation (i.e. gate closing and opening) along with the track changing if the train is sensed at the gate side. Once the train arrival is sensed at a distance of about 3 kms the microprocessor performs the gate operation along with the track changing, the identification of the train is done at a distance of 3 kms accordingly the particular operation is performed by the processor.Depending upon the priority of the incoming train, the unengaged track is given for train halting.
Vote: Tell A Friend
Reply With Quote  

 

  
Hi,I am doing this project in this semester.So if u kindly send me the needed information I'll be thankful.
Reply With Quote   Reply With Quote

 

  

kindly send me the project details as soon as possible..

my email id:

tiyasharma87@yahoo.com 

 

thanx.. 

Reply With Quote   Reply With Quote

 

  
pls can any body give me the detail description of the project
Reply With Quote   Reply With Quote

 

  
pls can any body help and give m ethe detail description on my id uindoria@yahoo.com
Reply With Quote   Reply With Quote

 

  
plz send me the descrition of this project...plz...aspen_ir20@yahoo.com
Reply With Quote   Reply With Quote
Page 2 of 8