Home >> Electronics >> railway control ststem using microprocessor
Railway control ststem using microprocessor
Date: 01/27/08
| Views: 2426
The aim of this project is to demonstrate the incorporation of computer method in railway traffic control to improve, safety, speed of handling the traffic and reliability. Here we employ the microprocessor (Intel 8085) to handle the signaling, track changing and gate operation and to monitoring the traffic. The system starts with the tracking if the train is sensed at the station side or starts with the gate operation (i.e. gate closing and opening) along with the track changing if the train is sensed at the gate side. Once the train arrival is sensed at a distance of about 3 kms the microprocessor performs the gate operation along with the track changing, the identification of the train is done at a distance of 3 kms accordingly the particular operation is performed by the processor.Depending upon the priority of the incoming train, the unengaged track is given for train halting.
I AM A 3RD YEAR STUDENT DOING ENGINEERING IN ELECTRONICS.
I WANT TO DO A PROJECT RELATED 2 MICRPROCCESOR.THIS ONE SOUNDS INTRESTING.CAN I GET FULL OF THIS ONE.PLZ CAN U MAIL ME THIS AS SOON AS POSSIBLE.MY MAIL ID IS jariwala.karan@gmail.com.
I want to know the detail send me detail , i m waiting sinceredoost@hotmail.com |
I'm study in third year in diploma in indutri. eng. in electr. intrumentation so this year I need to do final project. I would like to say I need your help can u plz send me full description of this project. methodology,its circuit diagram,report and all other necessary thing related to this. t_tranz88@yahoo.com.. thank's..
|
Page 1 of 1
|

